Eneabba & Eneabba North

Silica Sands Project

Eneabba North:

Eneabba North Project consists of a single Exploration Licence (E70/5250) and covers a total land area of 14km2.  The Project is strategically located proximal to rail and with direct access to the Brand Highway.

The Project is located directly adjacent to the east of VRX Silica Ltd’s Arrowsmith Central Project.  VRX Silica Ltd recently announced a mineral resource estimate totalling 76.5Mt at 98.6% SiO2 inclusive of an Indicated Resource of 28.2Mt at 96.6% SiO2 and Inferred Resource of 48.3Mt at 96.9% SiO2.

An auger drilling program has commenced across the priority target area located to the west of the Brand Highway.  The auger drilling program aims to define the extent and specifications of the silica sand.  The work is being conducted by contractors operating under a Miner’s Right across Vacant Crown Land.

Eneabba:

Eneabba Project consists of an Exploration Licence 70/5220 covers a total land area of 35.34km2 and is bounded on the eastern extent by both the Brand Highway and Geraldton Railway.

Subscribe for Updates

We would love to hear from you

Suite 801, Level 8,

84 Pitt Street ,

Sydney, NSW, 2000

LinkedIn_UI-02-512.png

© Copyright 2020. All rights reserved.