•Four discrete Project areas prospective for high purity silica sand and construction sand products- all located proximal to existing infrastructure

Beharra:

•Proximal to road infrastructure- 100km via road to Port of Geraldton

•Extensive target defined- 13km of strike and minimum 1.4km width

•Mineral sands drilling defined target thickness of between 6 to 33m

•Auger drilling confirms high purity silica from surface

Eneabba & Eneabba North:

•Prospective for both high purity silica sands and construction sands

Sargon:

•Strategically located adjacent to Brand Highway and 45km via road to Geraldton

•Priority high purity silica sand target identified